Mendota

Named in 3 PJM planning documents for 3 projects, from November 14, 2025 to October 16, 2026.

Existingdescribed as
COMEDzone
138 kV, 138kvkV as printed
3mentions

PJM interconnection queue

A PJM queue substation page has the same name: Mendota (IL) — 4 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Mendota-Sandwich 138 kV
b4025.1
Not printed $171.88 M 4/15/2030 Not printed 2025-12-12
SRRTEP Western
Mendota-Sandwich 138 kV Not printed $171.88 M 4/15/2030 Not printed 2025-11-14
SRRTEP Western
Mendota
ComEd-2026-016
Conceptual $4.85 M 6/1/2030 Not printed 2026-10-16
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Western
Item 04 - ComEd Supplemental Projects Presentation p. 8
Mendota “existing Mendota four breaker ring bus”
138kv
2025-12-12 SRRTEP Western
Item 16 - SRRTEP West - Reliability Analysis Update p. 4
Mendota-Sandwich 138 kV “Convert Mendota straight bus to a ring by installing four new 138 kV circuit breakers”
138 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 4
Mendota-Sandwich 138 kV “Convert Mendota straight bus to a ring by installing four new 138 kV circuit breakers.”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this