Named in 1 PJM planning document for 1 project, on November 13, 2025.

Existingdescribed as
BGEzone
—kV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
High Ridge to Dorsey Tap to Crystal Springs Tap
BGE-2025-007
Engineering $12.4M 6/31/2027 Not printed 2025-11-13
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named CRYSTAL SPRINGS; CRYSTAL SPRINGS TAP; DORSEY RUN; DORSEY RUN TAP; HIGH RIDGE → CRYSTAL SPRINGS; DORSEY RUN 2025-11-13 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2025-11-13 SRRTEP Mid-Atlantic
Item 03 - BGE Supplemental Projects - Version 3 p. 15
High Ridge to Dorsey Tap to Crystal Springs Tap “Reconductor approximately 5 miles of 110541/110542 double circuit 115 kV tower line from High Ridge to Dorsey Run Tap”