Emy
Named in 3 PJM planning documents for 1 project, from November 4, 2025 to October 6, 2026.
Newdescribed as
DOMzone
230kVkV as printed
3mentions
Described as new: “new substation (Emy)” — source, page 7
Also printed as: Emy Sub
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0051 · s4029 |
Conceptual | $26M | 05/01/2030 | 212 MW | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | EMY → EMY; KRAKEN; NEW POST; TRIBUTARY | 2025-11-04 | 2026-02-03 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 74 |
Dominion Transmission Zone: Supplemental Customer Load Request | “new substation (Emy)” 230kV |
| 2026-02-03 | TEAC Item 12 - DOM Supplemental Projects p. 7 |
Dominion Transmission Zone: Supplemental Customer Load Request | “new
substation (Emy)” 230kV |
| 2025-11-04 | TEAC Item 13 - DOM Supplemental Projects p. 8 |
Dominion Transmission Zone: Supplemental Customer Load Request | “new substation (Emy)” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.