Spurlock
Named in 4 PJM planning documents for 2 projects, from May 6, 2025 to October 6, 2026.
Existingdescribed as
EKPCzone
138 kVkV as printed
4mentions
Also printed as: Spurlock Station
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Maysville, KY/Mason County, KY/Spurlock, KY/Maysville, KY EKPC-2025-001 |
Engineering | $566.35 M | 9/01/2028 | 2200 MW | 2025-05-06 TEAC |
| Murphysville, KY EKPC-2025-006 · s4034.1 |
Engineering | $1.5 M | 3/28/2029 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| In-service date | 12/31/2028 → 3/28/2029 | 2025-11-14 | 2026-10-06 |
| Substations named | MURPHYSVILLE → HEADQUARTERS; MURPHYSVILLE; RENAKER; SPURLOCK; STONEWALL DISTRIBUTION | 2025-10-17 | 2025-11-14 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - EKPC Local Plan Submission of Supplemental Projects for 2026 p. 9 |
Murphysville, KY | No role wording 138 kV |
| 2026-10-01* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2026 RTEP p. 9 |
Murphysville, KY | No role wording 138 kV |
| 2025-11-14 | SRRTEP Western Item 07 - EKPC Supplemental Projects p. 6 |
Murphysville, KY | No role wording 138 kV |
| 2025-05-06 | TEAC Item 06 - EKPC Supplemental Projects p. 4 |
Maysville, KY/Mason County, KY/Spurlock, KY/Maysville, KY | “two new 345 kV lines from EKPC’s Spurlock Station” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.