Monroe

Named in 3 PJM planning documents for 3 projects, from November 4, 2025 to February 3, 2026.

Existingdescribed as
PPLzone
230/138 kV, 230kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PPL Transmission Zone: Baseline MAAC PPL Cluster
b4029.1
Not printed $565.4M 6/1/2030 Not printed 2025-12-08
TEAC
Martins Creek, PA
S0866
Engineering $66.9M 5/30/2028 Not printed 2026-02-03
TEAC
MAAC PPL Cluster
2025-W1-558
Not printed $565.4M 6/1/2030 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$44.86M → $66.9M 2026-02-03 2026-02-03

Every mention

DateDocumentProjectWhat the document says about it
2026-02-03 TEAC
Item 07 - PPL Supplemental Projects p. 3
Martins Creek, PA “reconfigure Martins Creek and Monroe substations”
230kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 28
PPL Transmission Zone: Baseline MAAC PPL Cluster “Monroe 230kV and 138kV reconfiguration”
230/138 kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 54
MAAC PPL Cluster “Monroe 230kV and 138kV reconfiguration and 2nd Monroe 230/138 kV transformer”
230/138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.