Named in 4 PJM planning documents for 1 project, from November 13, 2025 to October 6, 2026.

Existingdescribed as
JCPLzone
34.5 kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Martinsville - Readington 34.5 kV X778 Line – Customer Connection
JCPL-2025-010 · s3963.1
Not printed $1.08 M 06/01/2027 10 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 1/25/2027 → 06/01/2027 2025-11-13 2025-12-11

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 25
Martinsville - Readington 34.5 kV X778 Line – Customer Connection “Adjust relay settings at Martinsville and Readington substations”
2026-10-01* SRRTEP Mid-Atlantic
JCPL local plan submission for 2026 RTEP p. 25
Martinsville - Readington 34.5 kV X778 Line – Customer Connection “Adjust relay settings at Martinsville and Readington substations.”
2025-12-11 SRRTEP Mid-Atlantic
Item 08 - JCPL Supplemental Projects p. 9
Martinsville - Readington 34.5 kV X778 Line – Customer Connection “Adjust relay settings at Martinsville and Readington substations.”
34.5 kV
2025-11-13 SRRTEP Mid-Atlantic
Item 04 - JCPL Supplemental Projects p. 3
Martinsville - Readington 34.5 kV X778 Line – Customer Connection No role wording
34.5 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.