Hanover
Named in 4 PJM planning documents for 2 projects, from November 4, 2025 to October 6, 2026.
Existingdescribed as
DOMzone
230/36.5 kVkV as printed
5mentions
Also printed as: Hanover Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Slayden Creek 230kV Delivery - DEV DOM-2024-0004 · s3994 |
Conceptual | $ 26M | 12/1/2029 | 300 MW | 2026-10-06 TEAC |
| Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0017 · s3892 |
Engineering | $1.38M | 12/31/2026 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate | $1.5M → $1.38M | 2026-01-06 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 36 |
Dominion Transmission Zone: Supplemental Customer Load Request | “the single 230/36.5 kV transformer rated at 50 MVA in Hanover Substation is projected to be overloaded” 230/36.5 kV |
| 2026-10-06 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 58 |
Slayden Creek 230kV Delivery - DEV | No role wording |
| 2026-03-10 | TEAC Item 09 - DOM Supplemental Projects p. 8 |
Slayden Creek 230kV Delivery - DEV | “between Hanover and Four Rivers” |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 10 |
Dominion Transmission Zone: Supplemental Customer Load Request | “single 230/36.5 kV transformer rated at 50 MVA in Hanover Substation is projected to be overloaded” 230/36.5 kV |
| 2025-11-04 | TEAC Item 13 - DOM Supplemental Projects p. 7 |
Dominion Transmission Zone: Supplemental Customer Load Request | “transformer rated at 50
MVA in Hanover Substation” 230/36.5 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.