Named in 8 PJM planning documents for 6 projects, from June 5, 2025 to October 6, 2026.

Existingdescribed as
DOMzone
115kV, 230kVkV as printed
8mentions

PJM interconnection queue

A PJM queue substation page has the same name: Chesterfield (VA) — 11 queue requests filed, 8 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Baseline Second Chickahominy 500/230kV Transformer
b3213
Not printed $34.03M 6/1/2023 Not printed 2026-04-07
TEAC
Dominion Transmission Zone: Baseline Hopewell – Chesterfield – Basin 230 kV
b4030.1
Not printed $113.55 M 6/1/2030 Not printed 2025-12-08
TEAC
James Hill 230kV Delivery - DEV
DOM-2024-0036
Conceptual $26M 12/30/2031 in excess of 100 MW 2026-02-03
TEAC
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk
DOM-2025-0026 · s3915
Engineering $160M 12/31/2028 Not printed 2026-10-06
TEAC
Equipment Material Condition, Performance and Risk
DOM-2025-0026 Update
Engineering $160M 12/31/2028 Not printed 2025-09-09
TEAC
Hopewell – Chesterfield – Basin 230 kV
2025-W1-911
Not printed $113.55 M 6/1/2030 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$31.05M → $34.03M 2026-04-07 2026-04-07
Cost estimate $54M → $160M 2025-07-08 2026-10-06
Substations named CHESTERFIELD; CHICKAHOMINY; LADYSMITH; LANEXA; POSSUM POINT; PROVIDENCE FORGE; TURNER → CHESTERFIELD; LANEXA; PROVIDENCE FORGE; TURNER 2025-06-05 2025-07-08
Substations named CHESTERFIELD; LANEXA; PROVIDENCE FORGE; TURNER → CHESTERFIELD; CHICKAHOMINY; LANEXA; PROVIDENCE FORGE; TURNER 2025-07-08 2026-10-06
Cost estimate
prior value printed on the same page
$54M → $160M 2025-09-09 2025-09-09

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 94
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk No role wording
2026-04-07 TEAC
Item 11 - Reliability Analysis Update p. 18
Dominion Transmission Zone: Baseline Second Chickahominy 500/230kV Transformer No role wording
115kV
2026-02-03 TEAC
Item 12 - DOM Supplemental Projects p. 6
James Hill 230kV Delivery - DEV No role wording
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 20
Dominion Transmission Zone: Baseline Hopewell – Chesterfield – Basin 230 kV “Install new 230kV circuit breaker at Chesterfield Substation”
230kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 29
Hopewell – Chesterfield – Basin 230 kV “Install new 230kV circuit breaker at Chesterfield Substation”
230kV
2025-09-09 TEAC
Item 14 - DOM Supplemental Projects p. 3
Equipment Material Condition, Performance and Risk No role wording
2025-07-08 TEAC
Item 10 - DOM Supplemental Projects p. 3
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk No role wording
2025-06-05 TEAC
Item 08 - DOM Supplemental Projects p. 4
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.