Substation Scout

Mt. Eagle Tap

Named in 2 PJM planning documents for 2 projects, from November 4, 2025 to December 8, 2025.

Existingdescribed as
DOMzone
—kV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Baseline Charlottesville – Fork Union – Bremo 230 kV
b4030.9
Not printed $127.05 M 6/1/2030 Not printed 2025-12-08
TEAC
Hopewell – Chesterfield – Basin 230 kV
2025-W1-911
Not printed $113.55 M 6/1/2030 Not printed 2025-11-04
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 24
Dominion Transmission Zone: Baseline Charlottesville – Fork Union – Bremo 230 kV “Upgrade disconnect switches 202809 and 202806 at Mt. Eagle Tap”
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 33
Hopewell – Chesterfield – Basin 230 kV “Upgrade disconnect switches 202809 and 202806 at Mt. Eagle Tap”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this