Substation Scout

Charlottesville

Named in 3 PJM planning documents for 4 projects, from May 6, 2025 to December 8, 2025.

Existingdescribed as
DOMzone
230kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Baseline Hollymeade/Charlottesville Switch Upgrades
b3800.304
Not printed $0.3 M 12/30/2028 Not printed 2025-05-06
TEAC
Dominion Transmission Zone: Baseline 230kV Line #2054 Charlottesville-Proffit
b3800.360
Not printed $46.53 M 12/1/2028 Not printed 2025-05-06
TEAC
Dominion Transmission Zone: Baseline Charlottesville – Fork Union – Bremo 230 kV
b4030.9
Not printed $127.05 M 6/1/2030 Not printed 2025-12-08
TEAC
Hopewell – Chesterfield – Basin 230 kV
2025-W1-911
Not printed $113.55 M 6/1/2030 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$70.14 M → $46.53 M 2025-05-06 2025-05-06

Every mention

DateDocumentProjectWhat the document says about it
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 24
Dominion Transmission Zone: Baseline Charlottesville – Fork Union – Bremo 230 kV “Uprate all Line #2028 terminal equipment, line leads, and bus at Charlottesville substation”
230kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 33
Hopewell – Chesterfield – Basin 230 kV “Uprate all Line #2028 terminal equipment, line leads, and bus at Charlottesville and Fork Union substations”
230kV
2025-05-06 TEAC
Item 10 - Reliability Analysis Update p. 5
Dominion Transmission Zone: Baseline 230kV Line #2054 Charlottesville-Proffit No role wording
2025-05-06 TEAC
Item 10 - Reliability Analysis Update p. 7
Dominion Transmission Zone: Baseline Hollymeade/Charlottesville Switch Upgrades “Upgrade Charlottesville substation switch 205415”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.