Substation Scout

Basin

Named in 3 PJM planning documents for 3 projects, from April 10, 2025 to December 8, 2025.

Existingdescribed as
DOMzone
230kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Baseline Hopewell – Chesterfield – Basin 230 kV
b4030.1
Not printed $113.55 M 6/1/2030 Not printed 2025-12-08
TEAC
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk
DOM-2025-0015
Not printed Not printed Not printed 4 MW 2025-04-10
SRRTEP Southern
Hopewell – Chesterfield – Basin 230 kV
2025-W1-911
Not printed $113.55 M 6/1/2030 Not printed 2025-11-04
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 20
Dominion Transmission Zone: Baseline Hopewell – Chesterfield – Basin 230 kV “Uprate all Line #259 terminal equipment, line leads, and bus at Basin substation”
230kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 29
Hopewell – Chesterfield – Basin 230 kV “Uprate all Line #259 terminal equipment, line leads, and bus at Chesterfield & Basin substations”
230kV
2025-04-10 SRRTEP Southern
Item 01 - Dominion Supplemental Projects p. 4
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this