Named in 4 PJM planning documents for 2 projects, from December 3, 2024 to October 6, 2026.

Existingdescribed as
PENELECzone
230 kVkV as printed
4mentions

Also printed as: Shingletown Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Shawville and Lewistown 230 kV Terminal Upgrades
PN-2023-022 · s3986.1
Not printed $4.97M 06/15/2028 Not printed 2026-10-06
TEAC
Lewistown – Shingletown 230 kV Line
PN-2023-031
Not printed Not printed Not printed Not printed 2024-12-03
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named DALE SUMMIT; LEWISTOWN; SHAWVILLE; SHINGLETOWN → LEWISTOWN; SHAWVILLE; SHINGLETOWN 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 33
Shawville and Lewistown 230 kV Terminal Upgrades “Convert Shingletown Substation into a six-breaker 230 kV ring bus.”
230 kV
2026-10-01* SRRTEP Mid-Atlantic
Penelec local plan submission for 2026 RTEP p. 33
Shawville and Lewistown 230 kV Terminal Upgrades “Convert Shingletown Substation into a six-breaker 230 kV ring bus”
230 kV
2026-07-07 TEAC
Item 09 - Penelec Supplemental Projects p. 3
Shawville and Lewistown 230 kV Terminal Upgrades “The existing 230 kV yard at Shingletown is configured as a straight bus.”
230 kV
2024-12-03 TEAC
Item 06 - Penelec Supplemental Projects p. 3
Lewistown – Shingletown 230 kV Line No role wording
230 kV