Rocky Point

Named in 3 PJM planning documents for 4 projects, from December 3, 2024 to June 5, 2025.

Newdescribed as
PJM system-widezone
765 kV and a 500 kV, 765/500 kVkV as printed
4mentions

Described as new: “Construct a new substation called Rocky Point” — source, page 78

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Recommended Solution: 2024-W1-708
b4000.1
Not printed $1,945.05 M 12/1/2029 Not printed 2025-01-07
TEAC
Recommended Solution: 2024-W1-551
b4000.13
Not printed $13.97 M 6/1/2032 Not printed 2025-01-07
TEAC
2024 W1 Regional Cluster: Baseline b4000.6 Project Update
b4000.6
Not printed $353.5 M 6/1/2029 Not printed 2025-06-05
TEAC
2024W1 – Regional Cluster Preferred Solution: 2024-W1-708
2024-W1-708
Not printed $1,944.98 M 12/1/2029 Not printed 2024-12-03
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2025-06-05 TEAC
Item 09 - Reliability Analysis Update p. 51
2024 W1 Regional Cluster: Baseline b4000.6 Project Update No role wording
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 64
Recommended Solution: 2024-W1-708 “Construct a new substation called Rocky Point”
765/500 kV
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 66
Recommended Solution: 2024-W1-551 No role wording
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 78
2024W1 – Regional Cluster Preferred Solution: 2024-W1-708 “Construct a new substation called Rocky Point”
765 kV and a 500 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this