North Boyertown
Named in 3 PJM planning documents for 3 projects, from December 12, 2024 to October 6, 2026.
Existingdescribed as
METEDzone
230 kV, 69 kVkV as printed
3mentions
Also printed as: North Boyertown Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Hosensack Substation ME-2024-006 |
Conceptual | $39.36 M | 12/31/2030 | Not printed | 2026-10-06 TEAC |
| North Boyertown Substation ME-2024-024 |
Not printed | Not printed | Not printed | Not printed | 2024-12-12 SRRTEP Mid-Atlantic |
| Carsonia - Lyons - North Boyertown 69 kV 75 Line: Customer Connection, PA ME-2026-008 |
Not printed | Not printed | 10/31/2028 | approximately 13 MW | 2026-08-13 SRRTEP Mid-Atlantic |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Item 09 - MetEd Supplemental Projects - Presentation p. 4 |
Hosensack Substation | “At North Boyertown Substation: Revise relay settings” 230 kV |
| 2026-08-13 | SRRTEP Mid-Atlantic Item 03 - MetEd Supplemental Projects p. 3 |
Carsonia - Lyons - North Boyertown 69 kV 75 Line: Customer Connection, PA | No role wording 69 kV |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 09 - MetEd Supplemental Projects p. 3 |
North Boyertown Substation | “A faulted 69 kV bus tie breaker at North Boyertown Substation” 69 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.