Substation Scout

Elmont

Named in 3 PJM planning documents for 5 projects, from December 3, 2024 to December 8, 2025.

Existingdescribed as
PJM system-widezone
230.kV, 230kV, 500kVkV as printed
5mentions

Also printed as: Elmont Sub

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Recommended Solution: 2024-W1-24
b4000.300
Not printed $672.43 M 6/1/2029 Not printed 2025-01-07
TEAC
Recommended Solution: 2024-W1-967
b4000.344
Not printed $704.33 M 6/1/2029 Not printed 2025-01-07
TEAC
2025W1 – Regional Cluster Preferred Solution: Breaker Upgrades Not printed $18.5 M 6/1/2030 Not printed 2025-12-08
TEAC
2024W1 – Regional Cluster Preferred Solution: 2024-W1-24
2024-W1-24
Not printed $672.43 M 6/1/2029 Not printed 2024-12-03
TEAC
2024W1 – Regional Cluster Preferred Solution: 2024-W1-967
2024-W1-967
Not printed $704.25 M 6/1/2029 Not printed 2024-12-03
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$704.25 M → $704.33 M 2025-01-07 2025-01-07
Cost estimate
prior value printed on the same page
$571.63M → $661.63M 2026-05-08 2026-05-08
Cost estimate $704.33 M → $661.63M 2025-01-07 2026-05-08
In-service date 6/1/2029 → 9/16/2030 2025-01-07 2026-05-08
Substations named ELMONT; KRAKEN; LADYSMITH; NORTH ANNA; POSSUM POINT; YEAT → AQUIA HARBOR; BRISTERS; KRAKEN; LADYSMITH; NORTH ANNA; STAFFORD; THORNBURG 2025-01-07 2026-05-08

Every mention

DateDocumentProjectWhat the document says about it
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 123
2025W1 – Regional Cluster Preferred Solution: Breaker Upgrades “Elmont Sub 230.kV 7 63kA 80kA 7”
230.kV
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 60
Recommended Solution: 2024-W1-967 “Upgrade 500kV terminal equipment at Elmont substation”
500kV
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 68
Recommended Solution: 2024-W1-24 “Terminal equipment upgrades at Elmont”
230kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 76
2024W1 – Regional Cluster Preferred Solution: 2024-W1-967 “Upgrade terminal equipment at Elmont substation”
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 81
2024W1 – Regional Cluster Preferred Solution: 2024-W1-24 “Terminal equipment upgrades at Elmont”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this