Substation Scout

North Anna

Named in 2 PJM planning documents for 4 projects, from December 3, 2024 to January 7, 2025.

Existingdescribed as
PJM system-widezone
500.kV, 500kVkV as printed
4mentions

Also printed as: North Anna Sub

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PJM Selected Solution: Breaker Upgrades
b4000.110
Not printed $100.85 M 6/1/2029 Not printed 2025-01-07
TEAC
Recommended Solution: 2024-W1-967
b4000.344
Not printed $704.33 M 6/1/2029 Not printed 2025-01-07
TEAC
2024W1 – Regional Cluster Preferred Solution: Breaker Upgrades Not printed $88.09 M 6/1/2029 Not printed 2024-12-03
TEAC
2024W1 – Regional Cluster Preferred Solution: 2024-W1-967
2024-W1-967
Not printed $704.25 M 6/1/2029 Not printed 2024-12-03
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $100.85 M → $10.06 M 2025-01-07 2025-04-01
Cost estimate
prior value printed on the same page
$11.5 M → $10.06 M 2025-04-01 2025-04-01
Substations named ASHBURN; BEAUMEADE; BRADDOCK; BRAMBLETON; BRISTERS; BULL RUN; BUTTERMILK; CABIN RUN; CARSON; CLIFTON; DOUBS; EVERGREEN MILLS; GOOSE CREEK; LADYSMITH; LIBERTY; LOCKRIDGE; LOUDOUN; MARSH RUN; MORRISVILLE; MOSBY; MT STORM; NIMBUS; NIVO 1; NORTH ANNA; PARAGON PARK; PLEASANTVIEW; REMINGTON; ROUNDTABLE; VINT HILL; YARDLEY → DOUBS 2025-01-07 2025-04-01
Cost estimate
prior value printed on the same page
$704.25 M → $704.33 M 2025-01-07 2025-01-07
Cost estimate
prior value printed on the same page
$571.63M → $661.63M 2026-05-08 2026-05-08
Cost estimate $704.33 M → $661.63M 2025-01-07 2026-05-08
In-service date 6/1/2029 → 9/16/2030 2025-01-07 2026-05-08
Substations named ELMONT; KRAKEN; LADYSMITH; NORTH ANNA; POSSUM POINT; YEAT → AQUIA HARBOR; BRISTERS; KRAKEN; LADYSMITH; NORTH ANNA; STAFFORD; THORNBURG 2025-01-07 2026-05-08

Every mention

DateDocumentProjectWhat the document says about it
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 59
Recommended Solution: 2024-W1-967 “Upgrade/install equipment at North Anna substation to 5000A”
500kV
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 82
PJM Selected Solution: Breaker Upgrades No role wording
500.kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 76
2024W1 – Regional Cluster Preferred Solution: 2024-W1-967 “Upgrade substation equipment at North Anna”
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 93
2024W1 – Regional Cluster Preferred Solution: Breaker Upgrades No role wording
500.kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this