TBD substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 20 with terminal status (shown greyed).

0active projects
0active MW
20total filed
Queue IDProjectkVMWResourceStatus
AI1-131 TBD 115 kV 115 75 Battery Withdrawn
AH1-390 THP Solar 1 69 14.1 Solar Withdrawn
AH2-399 TBD 34.5kV 34.5 12 Solar Withdrawn
AH2-400 TBD 34.5kV 34.5 12 Solar Withdrawn
AI1-076 TBD 13.2 kV 13.2 10.9 Solar Withdrawn
AH2-201 TBD 12kV 12 5 Hybrid Withdrawn
AH2-250 TBD 13.2 kV 13.2 3.9 Solar Withdrawn
AH2-412 TBD 69kV 69 3.1 Solar Withdrawn
AH2-062 TBD 34kV 34 3 Solar Withdrawn
AH2-200 TBD 12kV 12 3 Hybrid Withdrawn
AI2-019 TBD 12.47 kV 12.5 3 Solar Withdrawn
AI2-018 TBD 23 kV 23 2.4 Solar Withdrawn
AH1-105 TBD 23 kV 23 2.3 Solar Withdrawn
AH1-077 TBD 34.5 kV 34.5 1.2 Solar Withdrawn
AH1-509 TBD 12 kV 12 0 Solar Withdrawn
AH2-055 TBD 69kV 69 0 Solar Withdrawn
AH2-065 TBD 69kV 69 0 Solar Withdrawn
AH2-109 TBD 12.47kV 12.5 0 Solar Withdrawn
AH2-134 TBD 34.5 kV 34.5 0 Solar Withdrawn
AI1-020 TBD n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.