Bedford North-Central City West substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-381 | Bedford North-Central City West 115 kV | 115 | 40.2 | Solar | Withdrawn |
| AI2-061 | Bedford North-Central City West 115 kV | 115 | 17.6 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.