Upton substation interconnection queue
2 active projects totalling 14 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
14active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G51_W63 | Upton | 34.5 | 9.9 | Gas | In Service |
| X1-028 | Upton 34.5kV | 34.5 | 7.6 | Solar | Withdrawn |
| I14 | Upton | 34.5 | 4.1 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.