Upton substation interconnection queue

2 active projects totalling 14 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
14active MW
3total filed
Queue IDProjectkVMWResourceStatus
G51_W63 Upton 34.5 9.9 Gas In Service
X1-028 Upton 34.5kV 34.5 7.6 Solar Withdrawn
I14 Upton 34.5 4.1 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.