Talbert substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| S18 | Talbert 230kV | 230 | 1,250 | Gas | Withdrawn |
| S17 | Talbert 230kV | 230 | 225 | Gas | Withdrawn |
| AH2-332 | Talbert 230kV | 230 | 115 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.