Bustleton substation interconnection queue

1 active project totalling 2.1 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
2.1active MW
5total filed
Queue IDProjectkVMWResourceStatus
J04 Bustleton 138kV 138 7 Gas Withdrawn
AE2-016 Bustleton 13.2 kV 13.2 2.4 Solar Withdrawn
AF2-247 FLR Florence Landfill 13.2 2.1 Solar In Service
AG2-422 Burlington Energy Storage 13 0 Hybrid Withdrawn
X3-007 LB Solar 13 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.