Substation Scout

Burlington, NJ interconnection queue

32 active projects totalling 658.5 MW in the PJM queue, plus 86 with terminal status (shown greyed).

32active projects
658.5active MW
118total filed
Queue IDProjectkVMWResourceStatus
U2-048 Cox's Corner-Croydon 230kV 230 640 Gas Withdrawn
G11 Burlington 138kV 138 622 Gas Withdrawn
D27 Salem - East Windsor 500kV 500 550 Gas Withdrawn
B09b Burlington 138kV 138 336 Gas Withdrawn
G12 Burlington 230kV 230 316 Gas Withdrawn
C01-1269 Burlington 230 kV 230 250 Battery Active
H07 Salem - East Windsor 500kV 500 200 Gas Withdrawn
B09A Burlington 138 168 Gas In Service
C01-1190 Crosswicks 230 kV 230 158 Battery Active
AF1-126 Cookstown 230 kV 230 50 Battery Withdrawn
AH2-127 Burlington 26 kV 26 18 Battery Withdrawn
G17 Burlington #10 n/r 16 Gas In Service
W2-060 Florence solar 26 7.6 Solar Withdrawn
W2-090 Stacy Haines Road 230 7.6 Solar Withdrawn
W3-031 Medford 69kV 69 7.6 Solar Withdrawn
W3-057 Warfield II 69 7.6 Solar Withdrawn
J04 Bustleton 138kV 138 7 Gas Withdrawn
O11 Burlington Co LF 13 7 Gas Deactivated
W4-062 Tabernacle 69kV 69 6.8 Solar Withdrawn
W2-089 Cookstown-Fort Dix 34.5kV 34.5 6.5 Solar Withdrawn
W3-080 Cedar Lane 26 5.7 Solar In Service
AG1-190 Burlington 26 kV 26 5.5 Solar Withdrawn
AD2-204 Burlington 26 kV 26 5 Solar Withdrawn
Z2-102 Dix Solar Farm 34.5 4.9 Solar In Service
AF2-174 Tabernacle 12 kV 12 4.6 Solar Withdrawn
W3-055 Lumberton 69kV 69 4.6 Solar Withdrawn
X3-043 Warfield I 69 4.6 Solar Withdrawn
AF2-254 NJ Land Phase II 34.5 4.2 Solar Withdrawn
W2-056 Reeves Station Road Solar 13 4.2 Solar In Service
AC2-050 Seneca Energy 12 3.8 Solar Withdrawn
AD2-027 Taylors Lane Solar 26 3.8 Solar In Service
W2-087 Mt. Holly 26kV 26 3.8 Solar Withdrawn
W3-041 Springfield Solar 26 3.8 Solar Withdrawn
X1-050 Lumberton 69kV 69 3.8 Solar Withdrawn
X1-051 Lumberton 69kV 69 3.8 Solar Withdrawn
X1-052 Lumberton 69kV 69 3.8 Solar Withdrawn
X2-014 Hedding Road Solar 26 3.8 Solar Withdrawn
Y1-017 Tabernacle n/r 3.8 Solar Withdrawn
Y3-026 Burlington (L&D Solar) 26kV 26 3.8 Solar In Service
W4-075 CleanLight Mansfield Solar Project 26 3.4 Solar Withdrawn
AE2-015 Cookstown-New Lisbon 34.5 kV 34.5 3.4 Solar Withdrawn
AC1-016 Burlington 26 kV Solar 26 3.3 Solar Withdrawn
W1-119 Greenburg Solar 34.5 3.3 Solar In Service
W1-120 Perez Solar 34.5 3.3 Solar In Service
W3-130 Mansfield Solar 13 3.2 Solar Withdrawn
AI2-209 Burlington 26kV (CIR Increase) 26 3.1 Solar Withdrawn
W3-056 Lumberton 69kV 69 3 Solar Withdrawn
W2-082 North Hanover Solar Farm 34.5 3 Solar In Service
Y3-048 Burlington Generating Station n/r 3 Gas In Service
Z1-096 Parkland Solar 26 3 Solar In Service
AD1-030 Camden 26 kV II 26 2.9 Solar Withdrawn
Z2-001 Recovery Road Solar Farm 26 2.7 Solar Withdrawn
W2-037 Cookstown 34.5kV 34.5 2.7 Solar Withdrawn
W2-102 West Pemberton Solar 26.4 2.7 Solar In Service
W4-103 North American Solar 26 2.7 Solar In Service
AB1-025 Lumberton Solar 13 2.6 Solar In Service
W4-025 North Run Solar 34.5 2.6 Solar In Service
AE2-016 Bustleton 13.2 kV 13.2 2.4 Solar Withdrawn
W2-019 Shemesh Solar Farm 34.5 2.3 Solar In Service
W4-074 CleanLight Medford Solar Project 13 2.3 Solar Withdrawn
Y3-027 Camden (Cinnaminson Solar) 26kV 26 2.3 Solar Withdrawn
X1-007 Hackettstown n/r 2.2 Solar Withdrawn
AE1-083 Busselton 13kV 13 2.1 Solar Withdrawn
AF2-247 FLR Florence Landfill 13.2 2.1 Solar In Service
AD2-069 Cox's Corner 13 kV 13 2 Solar Withdrawn
AG1-130 NAES 26 2 Battery Engineering and Procurement
AB2-121 Burlington 26kV 26 1.9 Solar Withdrawn
AE2-069 Burlington 13 kV 13 1.9 Solar Withdrawn
W1-129 Jacobstown Solar Farm 34.5 1.9 Solar In Service
W3-026 1900 River Road 13 1.9 Solar Withdrawn
W3-030 1626 Route 70 13 1.9 Solar Withdrawn
W3-038 Trotter Property 13 1.9 Solar Withdrawn
X1-021 Deptford Solar 13 1.9 Solar Withdrawn
X2-062 North Hanover n/r 1.9 Solar Withdrawn
X4-015 Jacobstown III Solar Farm 34 1.9 Solar In Service
AG2-254 New Lisbon 12.47 kV 12.5 1.7 Solar Withdrawn
AG2-255 South Hampton 13 kV 13 1.7 Solar Withdrawn
AC1-017 Levittown 13 kV Solar 13 1.4 Solar In Service
X1-070 Mill Creek 138 1.3 Solar In Service
AE2-162 Lumberton 13.2 kV 13.2 1.3 Hybrid Withdrawn
V2-015 Lumberton 13.2kV 13.2 1.3 Solar Withdrawn
AH1-077 TBD 34.5 kV 34.5 1.2 Solar Withdrawn
AB1-165 Tabernacle 12kV 12 1.1 Solar Withdrawn
AE2-141 Tabernacle 12 kV 12 1.1 Solar Withdrawn
V4-005 Lumberton SP 13.8 1.1 Solar In Service
X2-033 Ward Avenue Solar 26 1.1 Solar Withdrawn
AD2-065 Kettle Run 12 1.1 Solar In Service
W2-071 Mt. Laurel 13kV 13 1.1 Solar In Service
AD1-071 Levittown 13kV 13 1 Solar Withdrawn
W4-029 Reeve's Station North 13 0.9 Solar Withdrawn
AF1-261 North American Solar 26 0.9 Solar In Service
AE2-076 Southampton 13.2 kV 13.2 0.8 Solar Withdrawn
AE2-145 Tabernacle 12 kV 12 0.8 Hybrid Withdrawn
X1-077 Saylos Pond Solar Farm 34.5 0.8 Solar Withdrawn
W3-171 Rancocas Road Solar Project 13 0.8 Solar Withdrawn
W1-102 Southampton 13kV 13 0.7 Solar Withdrawn
W1-099 Levittown 2 SP 13 0.5 Solar Withdrawn
W2-058 Southampton 13kV 13 0.4 Solar Withdrawn
Y1-075 Reeve's Station South 13 0.4 Solar In Service
W1-098 Levittown SP 13 0.4 Solar Withdrawn
X1-071 Southern Division Headquarters 138 0.4 Solar In Service
AB2-107 Burlington 480V n/r 0 Gas Withdrawn
AB2-159 Lumberton 13kV 13 0 Solar Withdrawn
AD1-038 Oliver Solar n/r 0 Solar Withdrawn
AD1-107 McGuire Battery Storage n/r 0 Battery Withdrawn
AE1-223 Allentown Booster 138 kV 138 0 Solar Withdrawn
AE2-085 Southampton 13.2 kV 13.2 0 Hybrid Withdrawn
AE2-097 Levittown 13.2 kV 13.2 0 Solar Withdrawn
AE2-099 Burlington 13.2 kV 13.2 0 Hybrid Withdrawn
AE2-102 Columbus 13 kV 13 0 Hybrid Withdrawn
AE2-143 Yardville 13.2 kV 13.2 0 Hybrid Withdrawn
R91 Columbus-NJ n/r 0 Gas In Service
W2-077 Wrightstown 34.5kV 34.5 0 Solar Withdrawn
W3-025 Saylors Pond Solar Farm 34.5 0 Solar Withdrawn
X1-043 All American Self Storage 13 0 Solar Withdrawn
X1-054 Mansfield Solar 26 0 Solar Withdrawn
X2-015 Mt. Holly 26kV 26 0 Solar Withdrawn
X3-007 LB Solar 13 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.