Watson substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AF1-241 Watson 12.47 kV 12.5 9 Solar Withdrawn
AF2-284 NO-Oakes 12.5 0 Hybrid Withdrawn
AF2-289 NO-Vincent 12.5 0 Hybrid Withdrawn
AF2-427 Glidepath Ventures 12.5 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.