Watson substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-241 | Watson 12.47 kV | 12.5 | 9 | Solar | Withdrawn |
| AF2-284 | NO-Oakes | 12.5 | 0 | Hybrid | Withdrawn |
| AF2-289 | NO-Vincent | 12.5 | 0 | Hybrid | Withdrawn |
| AF2-427 | Glidepath Ventures | 12.5 | 0 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.