Watson substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

4 PJM queue filings name Watson as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Jul 2022 to Sep 2024 (4 filings).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-241 Watson 12.47 kV 12.5 9 Solar Withdrawn Jul 2022
AF2-284 NO-Oakes 12.5 0 Hybrid Withdrawn Feb 2023
AF2-289 NO-Vincent 12.5 0 Hybrid Withdrawn Sep 2024
AF2-427 Glidepath Ventures 12.5 0 Hybrid Withdrawn Feb 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Watson (PPL, 4 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Other PJM queue substations in Adams County, PA

All 86 PJM queue filings in Adams County, PA.

Other PJM queue substations in Northumberland County, PA

All 36 PJM queue filings in Northumberland County, PA.