South Harrington substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name South Harrington as the point of interconnection, all in Kent County, DE.
Target commercial operation dates as filed run from Jun 2012 to Oct 2024 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| T40 | South Harrington | n/r | 225 | Gas | Withdrawn | Jun 2012 |
| AH1-576 | South Harrington 69kV | 69 | 12 | Solar | Withdrawn | Oct 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Kent County, DE
- Cartanza: 1 active, 309.2 MW of 7 filed
- Clayton: 2 active, 153 MW of 3 filed
- Dover: 1 active, 98 MW of 3 filed
- Todd: 4 active, 46.9 MW of 16 filed
- Harrington: 4 active, 39 MW of 8 filed
- Cedar Creek I: 2 active, 15.1 MW of 2 filed
- Cedar Creek II: 2 active, 15.1 MW of 2 filed
- Kent-Harrington: 2 active, 8 MW of 2 filed
- TBD: none active of 20 filed
- Milford: none active of 4 filed
- New Meredith: none active of 2 filed
Site Scanner