New Baltimore (Stony Creek) substation interconnection queue

1 active project totalling 10.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
10.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-493 New Baltimore 115kV (Stony Creek) 115 18.2 Wind Withdrawn
P60 Stony Creek WF 115 10.5 Wind In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.