Wrightstown substation interconnection queue
1 active project totalling 2.3 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
2.3active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W2-019 | Shemesh Solar Farm | 34.5 | 2.3 | Solar | In Service |
| X1-077 | Saylos Pond Solar Farm | 34.5 | 0.8 | Solar | Withdrawn |
| W2-077 | Wrightstown 34.5kV | 34.5 | 0 | Solar | Withdrawn |
| W3-025 | Saylors Pond Solar Farm | 34.5 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.