Wrightstown substation interconnection queue
1 active project totaling 2.3 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name Wrightstown as the point of interconnection, all in Burlington County, NJ.
Target commercial operation dates as filed run from Apr 2011 to Sep 2016 (4 filings).
1active projects
2.3active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| W2-019 | Shemesh Solar Farm | 34.5 | 2.3 | Solar | In Service | Sep 2016 |
| X1-077 | Saylos Pond Solar Farm | 34.5 | 0.8 | Solar | Withdrawn | Sep 2014 |
| W2-077 | Wrightstown 34.5kV | 34.5 | 0 | Solar | Withdrawn | Apr 2011 |
| W3-025 | Saylors Pond Solar Farm | 34.5 | 0 | Solar | Withdrawn | Sep 2014 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Burlington County, NJ
- Burlington: 8 active, 450.1 MW of 24 filed
- Crosswicks: 2 active, 161 MW of 3 filed
- Southampton: 2 active, 81.1 MW of 7 filed
- Lumberton: 2 active, 6.8 MW of 14 filed
- Cookstown-Fort Dix: 2 active, 4.5 MW of 3 filed
- Trenton: 1 active, 3 MW of 6 filed
- Levittown: 2 active, 2.7 MW of 7 filed
- Mt. Holly: 1 active, 2.7 MW of 3 filed
- Bustleton: 1 active, 2.1 MW of 5 filed
- Deptford: 1 active, 1.9 MW of 6 filed
- Cookstown: 1 active, 1.9 MW of 3 filed
- Cinnaminson: 2 active, 1.4 MW of 2 filed
- Medford: 1 active, 0.4 MW of 3 filed
- TBD: none active of 20 filed
- Camden: 1 active, 0 MW of 8 filed
- Tabernacle: none active of 7 filed
- North Hanover: none active of 4 filed
- Yardville: none active of 3 filed
- Cookstown-New Lisbon: none active of 2 filed
- Cox's Corner: none active of 2 filed
All 118 PJM queue filings in Burlington County, NJ, including 2 more substations.