Substation Scout

Wrightstown substation interconnection queue

1 active project totaling 2.3 MW in the PJM queue, plus 3 with terminal status (shown grayed).

4 PJM queue filings name Wrightstown as the point of interconnection, all in Burlington County, NJ.

Target commercial operation dates as filed run from Apr 2011 to Sep 2016 (4 filings).

1active projects
2.3active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
W2-019 Shemesh Solar Farm 34.5 2.3 Solar In Service Sep 2016
X1-077 Saylos Pond Solar Farm 34.5 0.8 Solar Withdrawn Sep 2014
W2-077 Wrightstown 34.5kV 34.5 0 Solar Withdrawn Apr 2011
W3-025 Saylors Pond Solar Farm 34.5 0 Solar Withdrawn Sep 2014

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Burlington County, NJ

All 118 PJM queue filings in Burlington County, NJ, including 2 more substations.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first