2 active projects totaling 161 MW in the PJM queue, plus 1 with terminal status (shown grayed).

3 PJM queue filings name Crosswicks as the point of interconnection, all in NJ.

Target commercial operation dates as filed run from Jan 2012 to Apr 2031 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: PSEG (1 filing).

2active projects
161active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1190 Crosswicks 230 kV 230 158 Battery Active Apr 2031
W3-130 Mansfield Solar 13 3.2 Solar Withdrawn Jun 2012
W1-121 Property #6 13 3 Solar In Service Jan 2012

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Burlington County, NJ

All 118 PJM queue filings in Burlington County, NJ, including 2 more substations.

Other PJM queue substations in Mercer County, NJ

All 28 PJM queue filings in Mercer County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first