Pumphrey substation interconnection queue

1 active project totalling 155 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
155active MW
4total filed
Queue IDProjectkVMWResourceStatus
AA2-054 Pumphrey 230kV 230 155 Not reported In Service
V1-033 Fairfield Renewable Energy Facility 115 132 Other Withdrawn
W1-033 Fairfield Renewable Energy Facility 115 25 Other Withdrawn
AF2-028 Pumphrey 115 kV 115 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.