Richland substation interconnection queue
2 active projects totalling 61.8 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
61.8active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1703 | Richland 138 kV | 138 | 56.8 | Gas | Active |
| AH1-735 | Richland 138 kV | 138 | 55 | Gas | Withdrawn |
| AC1-181 | Richland Power Plant | 138 | 5 | Gas | In Service |
| AF2-277 | BU-Union | 12.5 | 0 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.