Substation Scout

Richland substation interconnection queue

2 active projects totalling 61.8 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
61.8active MW
4total filed
Queue IDProjectkVMWResourceStatus
C01-1703 Richland 138 kV 138 56.8 Gas Active
AH1-735 Richland 138 kV 138 55 Gas Withdrawn
AC1-181 Richland Power Plant 138 5 Gas In Service
AF2-277 BU-Union 12.5 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.