2 active projects totaling 61.8 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jun 2019 to May 2029 (4 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: ATSI (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1703 | Richland 138 kV | 138 | 56.8 | Gas | Active | May 2029 |
| AH1-735 | Richland 138 kV | 138 | 55 | Gas | Withdrawn | May 2026 |
| AC1-181 | Richland Power Plant | 138 | 5 | Gas | In Service | Jun 2019 |
| AF2-277 | BU-Union | 12.5 | 0 | Hybrid | Withdrawn | Feb 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Richland (ATSI, 8 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Defiance County, OH
- Bryan - Lockwood Rd.: 1 active, 192.4 MW of 2 filed
- Platter Creek: 2 active, 73.9 MW of 2 filed
- Lockwood Road: none active of 2 filed