Substation Scout

Arnold substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
B14 Arnold (Green Mountain) WF 115 2.1 Wind Deactivated
Z1-066 Green Mountain Battery 115 0 Battery In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.