Substation Scout

Northeast-CP Crane substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH2-162 Northeast-CP Crane 115kV 115 200 Battery Withdrawn
AI1-130 Northeast-CP Crane 115kV 115 75 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.