Substation Scout

Dover substation interconnection queue

1 active project totalling 98 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
98active MW
3total filed
Queue IDProjectkVMWResourceStatus
A28 Kent n/r 98 Gas In Service
N44 Dover n/r 1 Other Withdrawn
AA1-091 Dover 12kV 12 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.