Oak Grove substation interconnection queue

6 active projects totalling 398.8 MW in the PJM queue, plus 3 with terminal status (shown greyed).

6active projects
398.8active MW
9total filed
Queue IDProjectkVMWResourceStatus
B12_W02 Oak Grove CT1 & CT2 138 300 Gas In Service
G30_W52 Oak Grove CT1 & CT2 138 54 Gas In Service
AA2-131 Oak Grove 138kV 138 18 Gas In Service
Y2-054 Oak Grove 138kV 138 13.7 Gas In Service
AE1-124 VSF Solar I 34.5 13.3 Solar Withdrawn
AH1-398 Oak Grove 22.9 kV 22.9 11.7 Solar Withdrawn
AH1-637 Oak Grove 34.5 kV 34.5 9.6 Solar Active
B24 Oak Grove 13.8kV 13.8 6.8 Gas Withdrawn
H20 Oak Grove 13.8kV 13.8 3.5 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.