St. Thomas-Guilford substation interconnection queue
1 active project totaling 7.6 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name St. Thomas-Guilford as the point of interconnection, all in Franklin County, PA.
Target commercial operation dates as filed run from Jul 2012 to Aug 2020 (4 filings).
1active projects
7.6active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB1-127 | St. Thomas Township Solar Facility | 34.5 | 7.6 | Solar | In Service | Aug 2020 |
| W3-072 | St. Thomas-Guilford 34.5kV | 34.5 | 7.6 | Solar | Withdrawn | Jul 2012 |
| X4-001 | St. Thomas-Guilford 34.5kV | 34.5 | 7.6 | Solar | Withdrawn | Dec 2012 |
| X4-002 | St. Thomas-Guilford 34.5kV | 34.5 | 7.6 | Solar | Withdrawn | Dec 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Franklin County, PA
- McConnellsburg-Texas Eastern: 1 active, 100.5 MW of 3 filed
- Guilford: 2 active, 100 MW of 8 filed
- Grand Point: 1 active, 23.3 MW of 5 filed
- Upton: 2 active, 14 MW of 3 filed
- Warfordsburg: 1 active, 12 MW of 2 filed
- Mercersburg-Milnor: 1 active, 5.7 MW of 4 filed
- Roxbury: 1 active, 5.1 MW of 3 filed
- TBD: none active of 20 filed
- Fayetteville: none active of 5 filed
- McConnellsburg-Guilford: none active of 5 filed
- Mercersburg: none active of 2 filed