Substation Scout

St. Thomas-Guilford substation interconnection queue

1 active project totalling 7.6 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
7.6active MW
4total filed
Queue IDProjectkVMWResourceStatus
AB1-127 St. Thomas Township Solar Facility 34.5 7.6 Solar In Service
W3-072 St. Thomas-Guilford 34.5kV 34.5 7.6 Solar Withdrawn
X4-001 St. Thomas-Guilford 34.5kV 34.5 7.6 Solar Withdrawn
X4-002 St. Thomas-Guilford 34.5kV 34.5 7.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.