St. Thomas-Guilford substation interconnection queue

1 active project totaling 7.6 MW in the PJM queue, plus 3 with terminal status (shown grayed).

4 PJM queue filings name St. Thomas-Guilford as the point of interconnection, all in Franklin County, PA.

Target commercial operation dates as filed run from Jul 2012 to Aug 2020 (4 filings).

1active projects
7.6active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AB1-127 St. Thomas Township Solar Facility 34.5 7.6 Solar In Service Aug 2020
W3-072 St. Thomas-Guilford 34.5kV 34.5 7.6 Solar Withdrawn Jul 2012
X4-001 St. Thomas-Guilford 34.5kV 34.5 7.6 Solar Withdrawn Dec 2012
X4-002 St. Thomas-Guilford 34.5kV 34.5 7.6 Solar Withdrawn Dec 2012

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Franklin County, PA

All 80 PJM queue filings in Franklin County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first