Burches Hill-Chalk Point substation interconnection queue
2 active projects totaling 780 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Burches Hill-Chalk Point as the point of interconnection, all in Prince George's County, MD.
Target commercial operation dates as filed run from Jun 2018 to Nov 2026 (3 filings).
2active projects
780active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X4-035 | Keys Energy Center | 500 | 735.5 | Gas | In Service | Jun 2018 |
| AH2-269A | Burches Hill-Chalk Point 500kV | 500 | 45 | Gas | Withdrawn | Nov 2026 |
| Z1-052 | Keys Energy Center | 500 | 44.5 | Gas | In Service | Aug 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Prince George's County, MD
- Cheltenham: 4 active, 1,266.3 MW of 4 filed
- Chalk Point: 2 active, 676.2 MW of 5 filed
- Oak Grove: 6 active, 398.8 MW of 9 filed
- Aquasco: 1 active, 200 MW of 2 filed
- St. Barnabas: 1 active, 2.4 MW of 3 filed
- Prince George's County: 1 active, 0.8 MW of 2 filed
- TBD: none active of 20 filed
- Burches Hill: none active of 7 filed
- Burches Hill-Brandywine: none active of 3 filed
- Talbert: none active of 3 filed
- Chalk Point-Bowie: none active of 2 filed
- Hawkins Gate / Oak Grove: none active of 2 filed
- Livingston Road: none active of 2 filed
- Ritchie: none active of 2 filed
Site Scanner