Burches Hill-Chalk Point substation interconnection queue
2 active projects totalling 780 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
780active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| X4-035 | Keys Energy Center | 500 | 735.5 | Gas | In Service |
| AH2-269A | Burches Hill-Chalk Point 500kV | 500 | 45 | Gas | Withdrawn |
| Z1-052 | Keys Energy Center | 500 | 44.5 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.