Upper Deerfield substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Upper Deerfield as the point of interconnection, all in Cumberland County, NJ.

Target commercial operation dates as filed run from Jan 2013 to Jun 2014 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
V4-009 Deerfield Project n/r 3.8 Solar Withdrawn Jun 2014
X4-029 Upper Deerfield 12kV 12 0 Solar Withdrawn Jan 2013

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Cumberland County, NJ

All 94 PJM queue filings in Cumberland County, NJ.