Trenton substation interconnection queue

1 active project totalling 3 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
3active MW
6total filed
Queue IDProjectkVMWResourceStatus
X2-014 Hedding Road Solar 26 3.8 Solar Withdrawn
W4-075 CleanLight Mansfield Solar Project 26 3.4 Solar Withdrawn
Z1-096 Parkland Solar 26 3 Solar In Service
X2-033 Ward Avenue Solar 26 1.1 Solar Withdrawn
AB1-118 Trenton 13kV 13 0.7 Gas Withdrawn
Y1-063 Trenton 34.5kV 34.5 0 Battery Deactivated

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.