Fayetteville substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).
5 PJM queue filings name Fayetteville as the point of interconnection, all in Franklin County, PA.
Target commercial operation dates as filed run from Dec 2021 to Dec 2022 (5 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-188 | Fayetteville Solar | 34.5 | 12.6 | Solar | Withdrawn | Mar 2022 |
| AE2-269 | Fayetteville 138 kV | 138 | 9.2 | Solar | Withdrawn | Dec 2021 |
| AF1-151 | Fayetteville 34.5 kV | 34.5 | 8.4 | Solar | Withdrawn | Dec 2022 |
| AF1-224 | Fayetteville Solar | 34.5 | 7.9 | Solar | Withdrawn | Mar 2022 |
| AF1-061 | Fayetteville 12.47 kV | 12.5 | 1.2 | Solar | Withdrawn | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Fayetteville” in PA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Fayetteville: Expansion Tracker, PJM planning: PJM system-wide state not printed
Other PJM queue substations in Franklin County, PA
- McConnellsburg-Texas Eastern: 1 active, 100.5 MW of 3 filed
- Guilford: 2 active, 100 MW of 8 filed
- Grand Point: 1 active, 23.3 MW of 5 filed
- Upton: 2 active, 14 MW of 3 filed
- Warfordsburg: 1 active, 12 MW of 2 filed
- St. Thomas-Guilford: 1 active, 7.6 MW of 4 filed
- Mercersburg-Milnor: 1 active, 5.7 MW of 4 filed
- Roxbury: 1 active, 5.1 MW of 3 filed
- TBD: none active of 20 filed
- McConnellsburg-Guilford: none active of 5 filed
- Mercersburg: none active of 2 filed