Fayetteville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AE1-188 Fayetteville Solar 34.5 12.6 Solar Withdrawn
AE2-269 Fayetteville 138 kV 138 9.2 Solar Withdrawn
AF1-151 Fayetteville 34.5 kV 34.5 8.4 Solar Withdrawn
AF1-224 Fayetteville Solar 34.5 7.9 Solar Withdrawn
AF1-061 Fayetteville 12.47 kV 12.5 1.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.