Rockingham, VA interconnection queue
4 active projects totalling 235 MW in the PJM queue, plus 22 with terminal status (shown greyed).
4active projects
235active MW
26total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-028 | Prospect Power | 115 | 150 | Battery | Partially in Service - Under Construction |
| C01-1914 | North Shenandoah - Merck 115 kV | 115 | 110 | Hybrid | Withdrawn |
| AG1-151 | Endless Caverns 115 kV | 115 | 100 | Battery | Withdrawn |
| AG2-529 | Harrisonburg - Endless Caverns 230 kV | 230 | 78 | Hybrid | Withdrawn |
| C01-1383 | Endless Caverns 115 kV | 115 | 50 | Battery | Active |
| AF1-075 | Skyline Solar | 230 | 45.5 | Solar | Withdrawn |
| AG2-542 | North Shenandoah – Merck 115 kV | 115 | 42 | Hybrid | Withdrawn |
| AG1-137 | Harrisonburg 230 kV | 230 | 40 | Battery | Withdrawn |
| AJ1-002 | North River Delivery Point 115 kV | 115 | 40 | Battery | Withdrawn |
| AI1-108 | Endless Caverns - Timberville 115 kV | 115 | 33.1 | Hybrid | Withdrawn |
| AE2-029 | Sunridge Solar | 115 | 30 | Solar | Under Construction |
| AH2-232 | Not reported | n/r | 25 | Battery | Withdrawn |
| U2-068 | Lost River WF | 500 | 16.9 | Wind | Withdrawn |
| AD1-080 | Endless Caverns 34.5 kV | 34.5 | 12.3 | Solar | Withdrawn |
| AG2-387 | Cargill 115 kV (SVEC) | 115 | 12 | Solar | Withdrawn |
| AH2-399 | TBD 34.5kV | 34.5 | 12 | Solar | Withdrawn |
| AH2-400 | TBD 34.5kV | 34.5 | 12 | Solar | Withdrawn |
| AE1-098 | Endless Caverns Solar | 34.5 | 10.4 | Solar | Withdrawn |
| AE1-099 | Endless Caverns Solar | n/r | 10.4 | Solar | Withdrawn |
| AH2-105 | Merck 34.5 kV | 34.5 | 9.6 | Solar | Withdrawn |
| AH1-346 | Harrisonburg 356 34.5 kV | 34.5 | 9 | Solar | Withdrawn |
| AB1-097 | Harrisonburg-Stauton 115kV | 115 | 7.6 | Solar | Withdrawn |
| AG1-214 | Grottoes 12.5 kV | 12.5 | 7.6 | Battery | Withdrawn |
| Z1-113 | HP Hood Generation Facility | 13 | 5 | Gas | In Service |
| AH2-182 | PA-Oknefski 12.47 kV | 12.5 | 3 | Hybrid | Withdrawn |
| AH2-251 | PA- Shorb Mill 13 kV | 13 | 0 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.