Sunbury-Milton substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Sunbury-Milton as the point of interconnection, all in Northumberland County, PA.
Target commercial operation dates as filed run from Feb 2010 to Sep 2019 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AA1-057 | Northumberland Wood Fired Power Plant | 69 | 16 | Other | Withdrawn | Sep 2019 |
| V2-011 | Sunbury-Milton 69kV | 69 | 2.1 | Solar | Withdrawn | Feb 2010 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Northumberland County, PA
- Hamilton: 2 active, 500 MW of 5 filed
- Milton: 1 active, 43.5 MW of 4 filed
- Derry Tap-Derry Bus: 1 active, 8.4 MW of 2 filed
- Derry Tap-Derry Bus III: 1 active, 4.1 MW of 2 filed
- TBD: none active of 20 filed
- Watson: none active of 4 filed
- Sunbury-Dalmatia: none active of 2 filed