Sunbury-Milton substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AA1-057 Northumberland Wood Fired Power Plant 69 16 Other Withdrawn
V2-011 Sunbury-Milton 69kV 69 2.1 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.