Substation Scout

Rockwood substation interconnection queue

1 active project totaling 8 MW in the PJM queue, plus 4 with terminal status (shown grayed).

5 PJM queue filings name Rockwood as the point of interconnection, all in Somerset County, PA.

Target commercial operation dates as filed run from Dec 2005 to Dec 2024 (5 filings).

1active projects
8active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
L13 Casselman WF1 n/r 8 Wind In Service Jan 2008
AG1-205 Rockwood 23 kV 23 6.5 Solar Withdrawn Dec 2022
AG2-434 Rockwood 23 kV 23 6 Solar Withdrawn Jun 2023
AH2-359 Rockwood 23kV 23 3.2 Solar Withdrawn Dec 2024
L11 Rockwood 25 kV 25 2 Wind Withdrawn Dec 2005

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Somerset County, PA

All 107 PJM queue filings in Somerset County, PA.