Printz substation interconnection queue
3 active projects totalling 74 MW in the PJM queue, plus 4 with terminal status (shown greyed).
3active projects
74active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Y3-098 | Printz | n/r | 735 | Gas | Withdrawn |
| U3-023 | Printz 230kV | 230 | 720 | Gas | Withdrawn |
| AA2-140 | Liberty Electric | 230 | 35 | Gas | In Service |
| AC1-184 | Printz | n/r | 35 | Gas | Withdrawn |
| T129 | Liberty | 230 | 20 | Gas | In Service |
| Y2-064 | Liberty Electric | n/r | 19 | Gas | In Service |
| AF2-038 | Printz 230 kV | 230 | 8 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.