Carbondale substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Carbondale as the point of interconnection, all in WV.
Target commercial operation dates as filed run from Jun 2019 to Mar 2028 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-190 | Carbondale 138 kV | 138 | 40.2 | Solar | Withdrawn | Mar 2028 |
| AD1-149 | Carbondale 69 kV | 69 | 8.3 | Hybrid | Withdrawn | Jun 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fayette County, WV
- Kanawha River - Carbondale: 2 active, 117.8 MW of 3 filed
- Kanawha River: 1 active, 30 MW of 4 filed
- Kanawha: 1 active, 5.5 MW of 3 filed
- Layland: none active of 2 filed
- Nuttall: none active of 2 filed
Other PJM queue substations in Kanawha County, WV
- Kanawha River - Carbondale: 2 active, 117.8 MW of 3 filed
- TBD: none active of 20 filed
- Cabin Creek: none active of 3 filed
Site Scanner