Aquasco substation interconnection queue
1 active project totaling 200 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Aquasco as the point of interconnection, all in Prince George's County, MD.
Target commercial operation dates as filed run from Jun 2015 to Jan 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: PEPCO (1 filing).
1active projects
200active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X4-026 | Aquasco 230kV | 230 | 650 | Gas | Withdrawn | Jun 2015 |
| C01-1541 | Aquasco 230 kV | 230 | 200 | Battery | Active | Jan 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Prince George's County, MD
- Cheltenham: 4 active, 1,266.3 MW of 4 filed
- Burches Hill-Chalk Point: 2 active, 780 MW of 3 filed
- Chalk Point: 2 active, 676.2 MW of 5 filed
- Oak Grove: 6 active, 398.8 MW of 9 filed
- St. Barnabas: 1 active, 2.4 MW of 3 filed
- Prince George's County: 1 active, 0.8 MW of 2 filed
- TBD: none active of 20 filed
- Burches Hill: none active of 7 filed
- Burches Hill-Brandywine: none active of 3 filed
- Talbert: none active of 3 filed
- Chalk Point-Bowie: none active of 2 filed
- Hawkins Gate / Oak Grove: none active of 2 filed
- Livingston Road: none active of 2 filed
- Ritchie: none active of 2 filed