Aquasco substation interconnection queue

1 active project totaling 200 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Aquasco as the point of interconnection, all in Prince George's County, MD.

Target commercial operation dates as filed run from Jun 2015 to Jan 2030 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: PEPCO (1 filing).

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
X4-026 Aquasco 230kV 230 650 Gas Withdrawn Jun 2015
C01-1541 Aquasco 230 kV 230 200 Battery Active Jan 2030

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Prince George's County, MD

All 57 PJM queue filings in Prince George's County, MD.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first