Derry Tap-Derry Bus substation interconnection queue
1 active project totalling 8.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
8.4active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-059 | Cottontail Solar 4 aka East Chilli Solar | 69 | 8.4 | Solar | In Service |
| AE2-084 | Cottontail Solar 3 | 69 | 8.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.