Milton substation interconnection queue

1 active project totaling 43.5 MW in the PJM queue, plus 3 with terminal status (shown grayed).

Target commercial operation dates as filed run from Sep 2018 to Jul 2025 (4 filings).

1active projects
43.5active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-042 Northumberland Solar 69 43.5 Solar In Service Jul 2025
AI2-388 Milton 69 kV 69 20.2 Solar Withdrawn Dec 2024
AG1-050 Milton 69 kV 69 20 Battery Withdrawn Jun 2022
X3-041 Milton n/r 5.7 Solar Withdrawn Sep 2018

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Northumberland County, PA

All 36 PJM queue filings in Northumberland County, PA.

Other PJM queue substations in Sussex County, DE

All 70 PJM queue filings in Sussex County, DE.