Somerset substation interconnection queue
2 active projects totalling 11.8 MW in the PJM queue, plus 12 with terminal status (shown greyed).
2active projects
11.8active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-397 | Somerset 115 kV | 115 | 120 | Solar | Withdrawn |
| F04 | Keystone | 115 | 30 | Wind | Withdrawn |
| E13 | Somerset WF | 22.9 | 10 | Wind | In Service |
| AG1-467 | Somerset 34.5 kV | 34.5 | 9.4 | Solar | Withdrawn |
| O19 | Somerset (Kimberly Run) WF | 115 | 6.6 | Wind | Withdrawn |
| K10 | Somerset 115kV | 115 | 6 | Wind | Withdrawn |
| S29B | SCI Laurel Highlands | 23 | 5.7 | Gas | Deactivated |
| AE1-116 | Somerset 22.86kV | 22.9 | 4.5 | Battery | Withdrawn |
| C17 | Somerset 23kV | 23 | 4.5 | Gas | Withdrawn |
| C05 | Somerset 34.5kV | 34.5 | 3.8 | Gas | Withdrawn |
| AH2-316 | Somerset 23 kV | 23 | 3 | Solar | Withdrawn |
| AF2-104 | Somerset 23 kV | 23 | 2.4 | Solar | Withdrawn |
| K22 | Somerset WF | 22.9 | 1.8 | Wind | In Service |
| U2-070 | Somerset | n/r | 1 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.