1 active project totaling 63.8 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Carll's Corner as the point of interconnection, all in NJ.

Target commercial operation dates as filed run from Jan 2019 to Aug 2030 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: AEC (1 filing).

1active projects
63.8active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1009 Carll's Corner 69 kV 69 63.8 Battery Active Aug 2030
AF2-020 Carll's Corner Battery Storage 69 8 Battery Withdrawn May 2029
AD2-170 Carll's Corner 12 kV 12 0 Solar Withdrawn Jan 2019

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Salem County, NJ

All 114 PJM queue filings in Salem County, NJ, including 5 more substations.

Other PJM queue substations in Cumberland County, NJ

All 94 PJM queue filings in Cumberland County, NJ.