Carll's Corner substation interconnection queue
1 active project totalling 63.8 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
63.8active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1009 | Carll's Corner 69 kV | 69 | 63.8 | Battery | Active |
| AF2-020 | Carll's Corner Battery Storage | 69 | 8 | Battery | Withdrawn |
| AD2-170 | Carll's Corner 12 kV | 12 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.