Eldred-Pine Grove substation interconnection queue
2 active projects totalling 4.3 MW in the PJM queue.
2active projects
4.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U2-067 | Westwood Generation | 69 | 2.5 | Coal | In Service |
| Y3-034 | Stonegate Renewable Energy | 690 | 1.8 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.