Eldred-Pine Grove substation interconnection queue
2 active projects totaling 4.3 MW in the PJM queue.
2 PJM queue filings name Eldred-Pine Grove as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Jul 2008 to Dec 2013 (2 filings).
2active projects
4.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| U2-067 | Westwood Generation | 69 | 2.5 | Coal | In Service | Jul 2008 |
| Y3-034 | Stonegate Renewable Energy | 690 | 1.8 | Gas | In Service | Dec 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Bucks County, PA
Other PJM queue substations in Schuylkill County, PA
- Hegins: 1 active, 10.5 MW of 2 filed
- Pine Grove: 1 active, 8 MW of 2 filed
- Frackville-Hauto #3: 3 active, 7.1 MW of 3 filed
- Eldred: none active of 6 filed
- Eldred-Frackville: none active of 3 filed
- Frackville: none active of 3 filed
- Frackville-Fishbach: none active of 2 filed
- Frackville-Siegfried: none active of 2 filed
- Port Carbon: none active of 2 filed