Eldred-Pine Grove substation interconnection queue

2 active projects totaling 4.3 MW in the PJM queue.

2 PJM queue filings name Eldred-Pine Grove as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Jul 2008 to Dec 2013 (2 filings).

2active projects
4.3active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
U2-067 Westwood Generation 69 2.5 Coal In Service Jul 2008
Y3-034 Stonegate Renewable Energy 690 1.8 Gas In Service Dec 2013

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Bucks County, PA

All 19 PJM queue filings in Bucks County, PA.

Other PJM queue substations in Schuylkill County, PA

All 46 PJM queue filings in Schuylkill County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first