McConnellsburg-Texas Eastern substation interconnection queue

1 active project totaling 100.5 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name McConnellsburg-Texas Eastern as the point of interconnection, all in Franklin County, PA.

Target commercial operation dates as filed run from Jun 2019 to Jan 2028 (3 filings).

1active projects
100.5active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-101 Great Cove Solar II 138 100.5 Solar In Service Mar 2024
AD2-028 McConnellsburg-Texas Eastern n/r 76.3 Hybrid Withdrawn Jun 2019
AI2-298 McConnellsburg-Texas Eastern 138 kV 138 42 Solar Withdrawn Jan 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Franklin County, PA

All 80 PJM queue filings in Franklin County, PA.