McConnellsburg-Texas Eastern substation interconnection queue
1 active project totaling 100.5 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name McConnellsburg-Texas Eastern as the point of interconnection, all in Franklin County, PA.
Target commercial operation dates as filed run from Jun 2019 to Jan 2028 (3 filings).
1active projects
100.5active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-101 | Great Cove Solar II | 138 | 100.5 | Solar | In Service | Mar 2024 |
| AD2-028 | McConnellsburg-Texas Eastern | n/r | 76.3 | Hybrid | Withdrawn | Jun 2019 |
| AI2-298 | McConnellsburg-Texas Eastern 138 kV | 138 | 42 | Solar | Withdrawn | Jan 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Franklin County, PA
- Guilford: 2 active, 100 MW of 8 filed
- Grand Point: 1 active, 23.3 MW of 5 filed
- Upton: 2 active, 14 MW of 3 filed
- Warfordsburg: 1 active, 12 MW of 2 filed
- St. Thomas-Guilford: 1 active, 7.6 MW of 4 filed
- Mercersburg-Milnor: 1 active, 5.7 MW of 4 filed
- Roxbury: 1 active, 5.1 MW of 3 filed
- TBD: none active of 20 filed
- Fayetteville: none active of 5 filed
- McConnellsburg-Guilford: none active of 5 filed
- Mercersburg: none active of 2 filed