Substation Scout

McConnellsburg-Texas Eastern substation interconnection queue

1 active project totalling 100.5 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
100.5active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-101 Great Cove Solar II 138 100.5 Solar In Service
AD2-028 McConnellsburg-Texas Eastern n/r 76.3 Hybrid Withdrawn
AI2-298 McConnellsburg-Texas Eastern 138 kV 138 42 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.