McConnellsburg-Texas Eastern substation interconnection queue
1 active project totalling 100.5 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
100.5active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-101 | Great Cove Solar II | 138 | 100.5 | Solar | In Service |
| AD2-028 | McConnellsburg-Texas Eastern | n/r | 76.3 | Hybrid | Withdrawn |
| AI2-298 | McConnellsburg-Texas Eastern 138 kV | 138 | 42 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.